OK, the summer house is now cleared out, electrics have been restored, lighting installed and the baseboard has taken up residence, The Summer House is now, unofficially "The Engine Shed".
On Saturday I purchased the cork sheeting, 3 additional Peco point motors and a pack of Peco / Wills SSMP226 Brickwork, Flemish Bond for the Signal Box and Goods shed bases.
SHE is out on Tuesday, getting inebriated with the WI and then at a meeting Wednesday night, so chance to get into the Engine Shed and start laying the cork.
As I said in the last post, having Hazel Markham set up in the Engine Shed mean that I can leave things out, half done without the need to waste time packing up and clearing away, bliss.
No comments:
Post a Comment